Yangpu Port

  • 网络洋浦港
Yangpu PortYangpu Port
  1. This paper introduces the construction design of the caisson transportation system in Yangpu Port Phase II Project .

    介绍洋浦港二期工程沉箱出运系统的施工设计。

  2. Construction Technical Treatment of the Transition Part of Yangpu Port Phase I & Phase II Wharf Projects

    洋浦港一、二期码头工程过渡段施工技术处理

  3. Yangpu Port 300,000-ton oil terminal is the largest terminal in Hainan Province .

    洋浦港30万吨级油码头是海南省规模最大的码头。

  4. Selection of Explosive Tamping Parameter for Foundation Bed Riprapping of Yangpu Port Phase II Project and Its Application Effect

    洋浦港二期工程基床抛石爆夯参数的选取及应用效果基床爆夯在工程中的应用

  5. Abstract It introduces the road and storage yard arrangement of the second phase of Yangpu Port and the design load , foundation condition and structural design of the pavement .

    介绍洋浦港二期工程道路、堆场的平面布置和铺面设计荷载、地基条件及结构设计。

  6. Due to the complicated structure of the abutment wall at the west end of Yangpu Port Phase I Wharf , the transition part construction is technically rather difficult .

    洋浦港一期码头西端翼墙结构复杂,过渡段施工技术难度大。

  7. Hainan Yangpu Port is one of the three major cargo port , with crude oil , refined oil handling and transportation-based , with the port development , access to inbound vessels and cargo throughput increasing .

    洋浦港是海南省三大主要货运港之一,以原油、成品油装卸运输为主,随着港口发展,进出港船舶艘次和货物吞吐量呈增长趋势。

  8. Yangpu Port Phase II Project is connected to Phase I Project to the east and neighbouring the residential area of Yangpu Village to the west , thus the problem of safety of explosive tamping is quite conspicuous .

    洋浦港二期工程东接一期码头,西邻洋浦村居民区,爆夯施工安全问题相当突出。

  9. I.The establishment of Hainan Yangpu Bonded Port Area with a planned area of9.2063 square kilometers is hereby approved .

    同意在海南洋浦经济开发区内设立海南洋浦保税港区,规划面积9.2063平方公里。